• Waterproof Polyurea Building Material for Swimming Pool
  • Waterproof Polyurea Building Material for Swimming Pool
  • Waterproof Polyurea Building Material for Swimming Pool
  • Waterproof Polyurea Building Material for Swimming Pool
  • Waterproof Polyurea Building Material for Swimming Pool
  • Waterproof Polyurea Building Material for Swimming Pool

Waterproof Polyurea Building Material for Swimming Pool

CAS No.: 9016-87-9
Formula: 9016-87-9
EINECS: 9016-87-9
Source: Pol/ISO
Appearance: Liquid
Grade Standard: Industrial Grade
Samples:
US$ 0/kg 1 kg(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (20)

Basic Info.

Model NO.
ZHD-SPU
Colour
Grey
Type
Waterproof, Anti-Corrosion, Wear-Resistant Materia
Feature
Brilliant Colors, Tight Coating, Good Anti-Corrosi
Application
Swimming Pool
Style
2 Components
Surface Dry Time
15-20s
Tensile Strength
>18MPa
Solid Content
100%
Gel Time
5-10s
Hardness
95 Shore a
Elongation at Break
>500%
Transport Package
Drum
Specification
220kg/drum for A; 210kg/drum for B
Trademark
Zibo Huide
Origin
Zibo, China
HS Code
3506919090
Production Capacity
100, 000ton/Year

Product Description

Construction points:

Waterproof Polyurea Building Material for Swimming Pool
Construction points:
1.The base should be smooth, solid, dry, no sharp corners, no oil, no dust, making waterproof node treatment well.
2.After stirring well, use rubber or metal scraper evenly scraped, it should be divided into 2 to 3 times coated. The first time should be thin coating to closed pore at the local level,After the first layer drying, the film can be under construction, general interval of 24 h (low temperature environment dry time may be extended appropriately).The next brush direction is perpendicular to the upper brush direction
3.Total pained thickness is 1.5 2 mm, it should be brushed besmear again.the first time dry film-forming rear can besmear next time. film thickness is 1mm, the dosage is about 2kg per square meter.
4.The coating surface drying time is about 5 hours, and the actual working time is adjusted with the temperature change. The operator should strictly protect the finished film
5.The basement layer must be clean, smooth, solid, honeycomb, hemp surface, hollow drum and other defects need to be repaired. And instantly make well protection layer to avoid damaging the waterproof layer
6.Rain and snow days shall not be constructed, the ambient temperature is between -5-35C, good ventilation, no fireworks
7.Isolation layer constructions should accord to the relevant specifications or design requirements

 Performance characteristics

No.

Item

Specification

1

Flash point

>200°C

2

Tensile strength

15Mpa

21Mpa

3

Tensile elongation

350%

520%

4

Tear strength

59 KN/m

78 KN/m

5

Impact resistance

1.5Kg·m

1.5Kg·m

6

Adhesion

2.6Mpa

2.6Mpa

7

Hardness

Shore A85-95

Shore A80-90

8

Water impermeability,

0.4Mpa×2h

Impermeable

9

Specific gravity

1.02g/cm3

1.02g/cm3

10

Service temperature

-50°C-150°C

Packaging & Shipping

220kg /drum for A and 210kg/drum for B, 4 drums per pallet.
Waterproof Polyurea Building Material for Swimming Pool
Waterproof Polyurea Building Material for Swimming PoolWaterproof Polyurea Building Material for Swimming PoolWaterproof Polyurea Building Material for Swimming PoolWaterproof Polyurea Building Material for Swimming PoolWaterproof Polyurea Building Material for Swimming PoolWaterproof Polyurea Building Material for Swimming Pool

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now