Customization: | Available |
---|---|
CAS No.: | 9016-87-9 |
Formula: | 9016-87-9 |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ZHD-8005CSP is suitable for the usage of high density rigid PU foam, which can be used for the field of imitation wood Furniture, Ceiling Cornice,PU Faux Stone Wall Cladding Veneer and so on. It used together with isocyanate to make rigid PU foam through PU injection machine or handwork.The foam produced has the characteristics as following:
1. Products with low quantity and great strength
2. It works well with the intricate mold.
Item | Manual Mixing | Low Pressure Foaming Machine | High Pressure Foaming Machine |
Cream Time (S) | 15-30 | 13-22 | 10-25 |
Gel Time (S) | 40-150 | 38-140 | 35-120 |
Track Free Time (S) | 70-100 | 60-90 | 55-80 |
Free Rise Time kg/ m3 | 100-1000 | 100-1000 | 100-1000 |
High Density Panel Foam's Physical-chemical Properties | Items | Actual Value |
Appearance | Light yellow clear liquid | |
ISO:POL ratio | 1:1 | |
Stirring time(s): | 8 | |
Cream/Time(s): | 15-20 | |
Gel/Time(s): | 80-120 | |
Tack free/Time(s): | 140-160 | |
Free rise time(kg/m3) | 60-80 |
PACKING SPECIFICATION
200-220KGS/drum, blue paint drums (Drum Weight: 18 kgs)
STORAGE RECOMMENDATIONS
The blend polyol should be stored in the sealed container to avoid the absorption of water vapor. During the transportation, it should avoid serious shake and strong sunlight. It should be stored in ventilated place, avoiding light, water and fire. Recommended storage temperature is 15~25ºC.
FAQ
1.F:Why choose your company?
Q:Huide Company founded in year 2010,is a leading manufacturer of rigid PU foam blend polyol system materil, we have professional team,our products are stable andservice is decent.
2.F:Could you send me samples?
Q:Yes,sure. Normally,we can supply free sample for less than 5kg.But need the customer take charge of the express cost.
3.F:Are you a trader or manufacturer?
Q:We are manufacturer.We do our own blend polyol for over 15 years in china.
4.F:What's the MOQ?
Q:1 Drum.
5.F:What's the lead time?
Q:Within 3-5 days after payment.