• Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint
  • Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint
  • Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint
  • Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint
  • Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint
  • Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint

Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint

CAS No.: 9016-87-9
Formula: 9016-87-9
EINECS: 9016-87-9
Source: Pol/ISO
Appearance: Liquid
Grade Standard: Industrial Grade
Samples:
US$ 0/kg 1 kg(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Shandong, China
to see all verified strength labels (20)

Basic Info.

Model NO.
ZHD-SPU
Colour
Grey
Surface Dry Time
15-20s
Hardness
95 Shore a
Gel Time
5-10s
Solid Content
100%
Tensile Strength
>18MPa
Elongation at Break
>500%
Transport Package
Drum
Specification
220kg/drum for A; 210kg/drum for B
Trademark
Zibo Huide
Origin
Zibo, China
HS Code
3506919090
Production Capacity
100, 000ton/Year

Product Description

Technical data 
No. Item Index
I II
1 Color Optional
2 Solid 100%
3 Gel time 10 seconds
4 Mixing ratio(by volume) 1.1:1
5 Flash point >200°C
6 Recommended spreading thickness 1-2mm
7 Drying time Temperature, humidity and film thickness dependent

 Performance characteristics
No. Item Specification
1 Flash point >200°C
2 Tensile strength 15Mpa 21Mpa
3 Tensile elongation 350% 520%
4 Tear strength 59 KN/m 78 KN/m
5 Impact resistance 1.5Kg·m 1.5Kg·m
6 Adhesion 2.6Mpa 2.6Mpa
7 Hardness Shore A85-95 Shore A80-90
8 Water impermeability,
0.4Mpa×2h
Impermeable
9 Specific gravity 1.02g/cm3 1.02g/cm3
10 Service temperature -50°C-150°C
Construction points:
1.The base should be smooth, solid, dry, no sharp corners, no oil, no dust, making waterproof node treatment well.
2.After stirring well, use rubber or metal scraper evenly scraped, it should be divided into 2 to 3 times coated. The first time should be thin coating to closed pore at the local level,After the first layer drying, the film can be under construction, general interval of 24 h (low temperature environment dry time may be extended appropriately).The next brush direction is perpendicular to the upper brush direction
3.Total pained thickness is 1.5 2 mm, it should be brushed besmear again.the first time dry film-forming rear can besmear next time. film thickness is 1mm, the dosage is about 2kg per square meter.
4.The coating surface drying time is about 5 hours, and the actual working time is adjusted with the temperature change. The operator should strictly protect the finished film
5.The basement layer must be clean, smooth, solid, honeycomb, hemp surface, hollow drum and other defects need to be repaired. And instantly make well protection layer to avoid damaging the waterproof layer
6.Rain and snow days shall not be constructed, the ambient temperature is between -5-35C, good ventilation, no fireworks
7.Isolation layer constructions should accord to the relevant specifications or design requirements
Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint
Packaging & Shipping
220kg /drum for A and 210kg/drum for B, 4 drums per pallet.
Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof PaintHot Sale Swimming Pools Elastomer Polyurea Coating Waterproof PaintHot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint
Hot Sale Swimming Pools Elastomer Polyurea Coating Waterproof PaintHot Sale Swimming Pools Elastomer Polyurea Coating Waterproof PaintHot Sale Swimming Pools Elastomer Polyurea Coating Waterproof PaintHot Sale Swimming Pools Elastomer Polyurea Coating Waterproof Paint

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now