1.The base should be smooth, solid, dry, no sharp corners, no oil, no dust, making waterproof node treatment well.
2.After stirring well, use rubber or metal scraper evenly scraped, it should be divided into 2 to 3 times coated. The first time should be thin coating to closed pore at the local level,After the first layer drying, the film can be under construction, general interval of 24 h (low temperature environment dry time may be extended appropriately).The next brush direction is perpendicular to the upper brush direction
3.Total pained thickness is 1.5 2 mm, it should be brushed besmear again.the first time dry film-forming rear can besmear next time. film thickness is 1mm, the dosage is about 2kg per square meter.
4.The coating surface drying time is about 5 hours, and the actual working time is adjusted with the temperature change. The operator should strictly protect the finished film
5.The basement layer must be clean, smooth, solid, honeycomb, hemp surface, hollow drum and other defects need to be repaired. And instantly make well protection layer to avoid damaging the waterproof layer
6.Rain and snow days shall not be constructed, the ambient temperature is between -5-35C, good ventilation, no fireworks
7.Isolation layer constructions should accord to the relevant specifications or design requirements